NIA INTRODUCES ENHANCED DESIGN-AND-BUILD PROCUREMENT GUIDELINES FOR IRRIGATION INFRASTRUCTURE PROJECTS
The National Irrigation Administration (NIA) takes immense pride in announcing the approval of its new Design-and-Build (DB) Procurement Guidelines for Irrigation Infrastructure Projects. The approval of the NIA Board on this strategic instrument on March 21, 2024, marks a significant milestone in the agency’s commitment to fostering efficiency, transparency, and innovation of the organization to continue reading : NIA INTRODUCES ENHANCED DESIGN-AND-BUILD PROCUREMENT GUIDELINES FOR IRRIGATION INFRASTRUCTURE PROJECTS
Read MoreSETTING THE BAR: ISABELA SETS A NEW YIELD STANDARD FOR LOCAL FARMERS
On March 15, 2024, the Francis Domingo Nitura (FDN) Integrated Farm proudly hosted its Harvest Day World Breaking Rice Project 2024, a groundbreaking event that aimed to challenge the existing Asian record for crop harvesting that took place at the FDN Farm located in Ballesteros, Aurora, Isabela. Led by Baluarte’s Irrigators Association (IA) President, Mr. continue reading : SETTING THE BAR: ISABELA SETS A NEW YIELD STANDARD FOR LOCAL FARMERS
Read More82 COMPLETED SOLAR IRRIGATION PROJECTS IN 2023 TO AID IN EL NIÑO MITIGATION
NIA Central Office – A total of 82 solar power-driven pump irrigation projects were completed nationwide by the National Irrigation Administration (NIA) headed by Administrator Engr. Eduardo Eddie G. Guillen in 2023. For CY 2023, there are 150 potential irrigation sites for solar power-driven amounting to Php 1,654,583,000. Of which, NIA already completed the construction continue reading : 82 COMPLETED SOLAR IRRIGATION PROJECTS IN 2023 TO AID IN EL NIÑO MITIGATION
Read MoreBULACAN FARMER-IRRIGATORS TO BENEFIT FROM 16 COMPLETED PROJECTS; O&M SUBSIDY INCREASED TO PHP 500
NIA Central Office – OIC Deputy Administrator for Engineering and Operations Sector and concurrent NIA Region III Manager Engr. Josephine B. Salazar led the conduct of the Turnover of Completed Projects, Irrigators Association (IA) Consultation, and Contract Signing of the Bulacan Irrigation Management Office (IMO) on February 26, 2024 at NIA Region III Covered Court, continue reading : BULACAN FARMER-IRRIGATORS TO BENEFIT FROM 16 COMPLETED PROJECTS; O&M SUBSIDY INCREASED TO PHP 500
Read MoreMAYNILAD TURNS OVER FINANCIAL SUPPORT FOR BULACAN FARMERS
NIA Central Office – The National Irrigation Administration (NIA) Region III Manager and concurrent OIC Deputy Administrator for Engineering and Operations Sector Engr. Josephine B. Salazar received the P5-million worth of financial support from Maynilad Water Services, Inc. (Maynilad) for the Bulacan Irrigation Management Office (Bulacan IMO) on February 21, 2024 at NIA Region III continue reading : MAYNILAD TURNS OVER FINANCIAL SUPPORT FOR BULACAN FARMERS
Read MoreDA, NIA, AND DTI SIGN MOU ON INTEGRATED RICE SUPPLY CHAIN DEVELOPMENT PROGRAM
NIA Central Office – The efficient rice supply chain and development of a business-to-business (B2B) online market platform for rice are now more feasible with the Ceremonial Signing of the Memorandum of Understanding (MOU) on the Integrated Rice Supply Chain Development Program on February 2, 2024 at NIA Matikas Multipurpose Hall. The participants for the continue reading : DA, NIA, AND DTI SIGN MOU ON INTEGRATED RICE SUPPLY CHAIN DEVELOPMENT PROGRAM
Read MoreNEWLY-INSTALLED BUSTOS DAM RUBBER GATE TO BENEFIT BULACAN AND PAMPANGA
NIA Central Office – The National Irrigation Administration (NIA) successfully installed a new Rubber Gate No. 5 at the Angat Afterbay Regulator Dam or most commonly known as Bustos Dam, a run of the river type of dam, located in Barangay Tibagan, Bustos, Bulacan on January 20, 2024. Preceding the replacement of the new rubber continue reading : NEWLY-INSTALLED BUSTOS DAM RUBBER GATE TO BENEFIT BULACAN AND PAMPANGA
Read MoreGEARING UP TO MORE IMPROVED IRRIGATION INFRASTRUCTURES
With the unwavering support of President Ferdinand R. Marcos, Jr. in fostering the agricultural sector, the National Irrigation Administration (NIA) headed by Acting Administrator Engr. Eduardo Eddie G. Guillen successfully acquired the 141 units of excavator amounting to a total significant investment of P776 million. These excavators were finally distributed to NIA regional and project continue reading : GEARING UP TO MORE IMPROVED IRRIGATION INFRASTRUCTURES
Read MorePARTIAL EARTHQUAKE DAMAGES ON IRRIGATION INFRASTRUCURES REACH ₱109.49 MILLION
NIA Central Office – Immediately after the Magnitude 5.2 earthquake in Region VIII on November 20, 2023 and Magnitude 7.6 earthquake on December 2, 2023 in Caraga, NIA Acting Administrator Engr. Eduardo Eddie G. Guillen directed all NIA Regional Managers to conduct inventory and assessment of damages to irrigation infrastructures. Based on the partial report submitted by continue reading : PARTIAL EARTHQUAKE DAMAGES ON IRRIGATION INFRASTRUCURES REACH ₱109.49 MILLION
Read MoreNIA SIGNS 2 MOUS FOR IRRIGATION DEVELOPMENT
NIA Central Office – The National Irrigation Administration (NIA) enters into two Memoranda of Understanding (MOU) to fast-track irrigation development and utilization of NIA’s assets and irrigation projects for renewable energy development on December 7, 2023 at NIA Administrator’s Conference Room, 3rd Floor, Building B. NIA Acting Administrator Engr. Eduardo Eddie G. Guillen and BPE continue reading : NIA SIGNS 2 MOUS FOR IRRIGATION DEVELOPMENT
Read More