Excavation of Re-Regulating Pond, Construction of Slope Protection and Drainage Inlet (Sta. 0+00 – Sta. 0+260 and Sta. 0+740 – Sta. 1+270) under the Lower Agno River Irrigation System Improvement Project
MINUTES OF MEETING
PRE-BIDDING CONFERENCE
Excavation of Re-Regulating Pond, Construction of Slope Protection and Drainage Inlet (Sta. 0+000 – Sta. 0+260 and Sta. 0+740 -Sta. 1+270) under the Lower Agno River Irrigation System Improvement Project
February 4, 2020,09:30 AM
Classroom “A”, 3rd Floor, lEC Building,
NIA Complex, EDSA, Quezon City
I. ATTENDANCE
1.1 Present:
| BGEN ABRAHAM B BAGASIN (Ret) | Chairperson, BAC-A | |
| PEPITO L. PADILLA | Member, BAC-A | |
| ANGELITO MIGUEL | Provisional Member | |
| ROGELIA S. DELA TORRE | Head, TWG | |
| MILAGROS C. NOPRE | Member, TWG | |
| JOSELITO C. MERCADO | Member, TWG | |
| ABEL ALDWIN P. AROMIN | Member, TWG | |
| FELIPA E. MASCARIÑAS | Head, Secretariat | |
| FAE-ANGELIE G. DATU | Alternate Head Secretariat | |
| MARCELINO M. LIM | Member, Secretariat | |
| ZOSIMO R. BAIRA | Member, Secretariat | |
| PAULO L. ROXAS | Member, Secretariat | |
| JAASIEL ANNE T. TANIEGRA | Member, Secretariat | |
| GERARD E. GUZMAN | Support Staff, Secretariat | |
| JENIFER JANE G. ALALAY | Support Staff, Secretariat | |
| MICHAEL B. BORAS | Support Staff, Secretariat | |
| MARTIN IAN P. MARIANO | Support Staff, Secretariat | |
| JOHN REXTER B. CRUZ | Support Staff, Secretariat | |
| ANTONIO G. BATO III | LARISIP Representative |
1.2 Absent:
| AILYNE C. AGTUCA-SELDA | Vice-Chairman, BAC-A | |
| LYDIA S. ESGUERRA | Member, BAC-A | |
| ARNOLD L. SALAZAR | Member, TWG | |
| MARTY P. CACHAPERO | Member, twg |
Excavation of Re-Regulating Pond, Construction of Slope Protection
Minutes of Pre-Bidding Conference
Committee: BAC-A
Code: R1-LARISIPD-C-2
Schedule: Tuesday, February 4, 2020 - 01:30
Venue: Classroom A
Attachment: R1-LARISIPD-C-2_prebid_conference